Announcement
October 4, 2012

To pickup where we left off, let’s review what we have in the drawing.

The missing part is the parcel information in the data band between the “property lines.”
To do this, we have two options, one would be to just create hard text that would require re-positioning whenever the alignment moved or use a pipe connected to the structures, allowing the pipe information to adjust as the alignment adjusted. But how do we use the pipe to use the parcel information? Well, we need to assign optional properties to a part. It’s these optional properties we want.
Read the rest of this blog entry at Kevin Spear’s Blog, Land Development Engineering.
Learn more about Kevin on LinkedIn.